Asset Report

Sangomar

This report is currently unavailable

For details on how your data is used and stored, see our Privacy Notice.
 

- FAQs about online orders

*Please note that this report only includes an Excel data file if this is indicated in "What's included" below

Sangomar is a large oil and gas field in deepwater Senegal, 85 kilometres offshore. The SNE-1 discovery well in 2014 encountered shelf-edge Cretaceous oil and gas reservoirs associated with turbidite flows. Sangomar came onstream in June 2024.The first phase was sanctioned in January 2020. It was developed via subsea wells tied back to a converted floating production storage and offloading (FPSO) vessel with 100,000 b/d capacity. This phase of development is targeting Sangomar's less ...

Table of contents

  • Summary
    • Participation history
    • FPSO Leopold Sedar Senghor
    • Wells
    • Subsea
  • Phase 2
  • Gas
  • Exploration costs
  • Capital costs
    • Cost recovery
    • Profit oil
    • Income tax
  • Cash flow
  • Global Economic Model (GEM) file name
  • Cash Flow

Tables and charts

This report includes the following images and tables:

    Index MapSangomar detail mapCapital costs
    Operating Costs 2024 to 2033 (US$ million)Cash Flow (US$)PV Table (US$)Summary Table (US$)Split of RevenuesCumulative Net Cash Flow - UndiscountedCumulative Net Cash Flow - Discounted at 10% from 01/01/2026Remaining PV Price SensitivitiesRSSD Development Area participation
  • 7 more item(s)...

What's included

This report contains:

  • Document

    Sangomar

    PDF 2.89 MB