CCS: upstream’s commercial conundrum
*Please note that this report only includes an Excel data file if this is indicated in "What's included" below
Report summary
Table of contents
- Executive summary
- CCS: back to the future
- CCS in an upstream context
- 
        
            The future challenges for upstream CCS: regulatory, commercial and subsurface
        
        - 1. Regulatory: law, liability and leaks
- 2. Commercial: a question of cost or a question of value?
- 3. Subsurface: When the details matter
 
- Where next?
Tables and charts
This report includes the following images and tables:
- 
         Carbon capture capacity – our current trajectory (ETO) vs scenario required to limit global warming by 2 degrees (AET-2)Key upstream CCS projects to watchRegulatory case study
     
- 
            The cost of CCS vs carbon price – pre-tax IRR based on CCS projects creating revenue from sequestrationCommercial case studySubsurface case study
        
What's included
This report contains:
Other reports you may be interested in
The UK government's North Sea consultation conundrum
The industry is at a low ebb, but the pathway ahead should be clear
$1,350Berbigao and Sururu
Berbigão (including Sururu after the unitisation)is a pre-salt accumulation in the Santos basin. The field originates from the Iara...
$3,720Lapa
Lapa is a pre-salt oil and gas field located in the Santos basin. It lies within the core pre-salt cluster area and was known as ...
$3,720 
         
         
         
         
         
         
     
     
     
     
     
     
     
     
    