The conundrum of contracting thermal capacity in Brazil
*Please note that this report only includes an Excel data file if this is indicated in "What's included" below
Report summary
Table of contents
- No table of contents specified
Tables and charts
No table or charts specified
What's included
This report contains:
Other reports you may be interested in
Beyond costs: How operational flexibility would reshape the 2026 Brazil’s reserve capacity auction
An insight that analyses the upcoming reserve capacity auction in Brazil
$3,000Trombetas bauxite mine
A detailed analysis of the Trombetas bauxite mine.
$2,250Jamalco alumina refinery
A detailed analysis of the Clarendon alumina refinery.
$2,250