Asset Report

Fetekro gold mine project (missing region)

Get this report*

$2,250

You can pay by card or invoice

For details on how your data is used and stored, see our Privacy Notice.
 

- FAQs about online orders

*Please note that this report only includes an Excel data file if this is indicated in "What's included" below

Following a strategic exploration review in 2016, Endeavour identified Fetekro as a top priority greenfield target. It is located in north-central Côte d’Ivoire, ~500km from Abidjan, within the northern-end of the Oumé-Fetekro Greenstone Belt. Only a small portion of the property has been explored so far, as the priority has been the Lafigué deposit. An initial PEA based on Indicated Resource of 1.2Moz, with an 8-year mine life, demonstrated positive results. An updated Pre-Feasibility Study (PFS) was published in February 2021, which was based on an Indicated Resource of 2.5Moz compared to previous 1.2Moz Indicated Resource. The PFS envisages a mine life of 9.5 years, with annual average gold production at 209koz/a.

Table of contents

  • Summary
  • Key Issues
  • Mining
  • Processing
  • Capital Costs
  • Closure Costs
  • Power

Tables and charts

This report includes the following images and tables:

    Detailed Map

What's included

This report contains:

  • Document

    Fetekro gold mine project (missing region)

    PDF 1.28 MB