Aban and West Paydar (IPC)
*Please note that this report only includes an Excel data file if this is indicated in "What's included" below
Report summary
Table of contents
- Summary
- Key Issues
- Field structure
- Emissions
-
Phase 1: Remediation and improved oil recovery (2022-2024)
- Wells
- Processing facilities
-
Phase 2: Accelerated development (2025-2030)
- Subsurface evaluation
- Drilling programme
- Phase 3: Plateau maintenance and optimisation (2030 onwards)
- Capital costs
-
Operating costs
- Depreciation
- Cash flow
- Global Economic Model (GEM) file
- Cash Flow
Tables and charts
This report includes the following images and tables:
-
Index mapDetail mapParticipation
-
Hydrocarbon and reservoir characteristicsReserves (2P) at 01/01/2026Production (2018-2024)Production profilePipeline summaryCapital Costs Pre-2016 to 2024 (US$ million)Operating Costs 2025 to 2029 (US$ million)Domestic gas prices
- 7 more item(s)...
What's included
This report contains:
Other reports you may be interested in
Tahe
Tahe is a heavy oil project in Tarim Basin. Oil is piped to the Lanzhou refinery in Gansu province.
$3,720Nigeria offers 50 blocks in 2025 bid round: spotlight on discovered resource opportunities
Nigeria launched its 2025 licensing round on 1 December, marking the country’s third bid round since 2022.
$1,350CA2 (Kelidang Cluster) (LNG)
Positioned to be Brunei’s first ultra-deepwater development, the Petronas-operated gas fields are expected to reach FID in the near term.
$3,720