Australia Pacific LNG (APLNG) is an integrated coal seam gas (CSG) to LNG project in Queensland. The joint venture operating the project is comprised of Origin Energy, ConocoPhillips and Sinopec. FID on a one-train development was taken in July 2011 and on the second train in July 2012. First LNG was shipped in January 2016. We expect the project to produce at a plateau rate of 9.0 million tonnes per annum (mmtpa) of LNG over its 30-year life. Gas is supplied from APLNG's CSG fields in the Bowen and Surat Basin.

Table of contents

  • Key facts
    • Summary
    • Key issues
  • Location maps
    • Tri-Star reversion rights
    • Spring Gully
    • Talinga/Condabri/Orana
    • Combabula/Reedy Creek
    • Peat
    • Key operated acreage
      • Spring Gully (ATP-584-P)
      • Talinga, Orana, Condabri (ATP-692-P)
      • Combabula (ATP-606-P)
      • Woleebee, Carinya (ATP-847-P)
    • Key non-operated acreage
      • Argyle-Kenya (ATP-620-P)
      • Fairview (ATP-526-P)
    • Equity gas
    • Reserves by supply area
    • Ramp gas
    • LNG production
    • Domestic gas production
    • Pre-FID/Feed
      • Pre-existing developments
    • Upstream development
      • Gas facilities
      • Development drilling
      • Water Treatment
    • Liquefaction plant development
    • Key Export Pipelines
    • Pre-FID
    • FID capital expenditure guidance
    • Post-FID capital expenditure guidance
      • Upstream
      • Downstream
    • Ongoing capex
    • Operating Costs
    • Gas Sales
    • Domestic Sales
    • LNG Sales
      • Train 1
      • Train 2
      • Other contracts
    • Corporate income tax
    • Integrated project
      • Royalty
  • 2 more item(s)...

Tables and charts

This report includes the following images and tables:

    Key facts: Table 1Index MapAPLNG Upstream Detail Map
    Cash flowEconomic analysis: Table 2Economic analysis: Table 3Split of RevenuesCumulative Net Cash Flow - UndiscountedCumulative Net Cash Flow - Discounted at 10% from 01/01/2026Remaining Revenue Distribution (Discounted at 10% from 01/01/2026)Remaining PV Price SensitivitiesParticipation: Table 1