Clipper South
*Please note that this report only includes an Excel data file if this is indicated in "What's included" below
Report summary
Table of contents
- Summary
- Key Issues
- Future development uncertainty and effect of cost share
- Production and well management challenges
-
Wells
- Platform
- Gas export re-route
- Capital costs
- Decommissioning costs
- Operating costs
- Cash flow
- Cash Flow
Tables and charts
This report includes the following images and tables:
-
Index mapClipper South mapParticipation
-
Field hydrocarbon characteristicsClipper SouthReserves (2P) at 01/01/2026Production (2016-2025)Production profileCapital Costs Pre-2021 to 2026 (US$ million)Capital Costs 2031 to 2034 (US$ million)Operating Costs 2026 to 2031 (US$ million)Cash Flow (US$)
- 8 more item(s)...
What's included
This report contains:
Other reports you may be interested in
Sole Pit (excl. Galleon)
The Sole Pit Area comprises the Barque, Barque South, Clipper and Skiff gas fields. The Sole Pit fields have been developed in phases. ...
$3,720Clipper (GC 299)
Clipper (GC 299) is a small oil and gas field located in the northeast of the Green Canyon protraction area of the Central Gulf of ...
$3,720Galkynysh (South Iolotan)
State-owned Turkmengaz operates South Iolotan, the world's second-largest gas field. The super-giant, pre-salt sour gas deposit is ...
$5,280