Asset Report

CNPC Ai-Dan Munai

Get this report*

$3,720

You can pay by card or invoice

For details on how your data is used and stored, see our Privacy Notice.
 

- FAQs about online orders

*Please note that this report only includes an Excel data file if this is indicated in "What's included" below

CNPC has operated the Ai-Dan Munai oil project since 2005. It initially consisted of two legacy fields, Arisskoye and Blinovskoye, in the South Turgai basin in central Kazakhstan. The operator's extensive E&A activity resulted in multiple smaller oil discoveries. Most satellite fields have been developed and are onstream. The fields are located close to other CNPC upstream assets and infrastructure, notably those operated by the part-owned PetroKazakhstan and Kazgermunai ...

Table of contents

  • Summary
  • Key Issues
  • Corporate
    • Overview
    • Area extension
    • Modelling
    • Arisskoye
    • Blinovskoye
    • Southwest Sarybulak
    • Karakol
  • Post-2005 discoveries
    • Modelling
  • Gas
  • Oil
    • Key development metrics
    • Exports
    • Domestic
    • Current routes
  • Capital costs
  • 4 more item(s)...

Tables and charts

This report includes the following images and tables:

    Index mapCNPC Ai-Dan Munai mapReserves (2P) at 01/01/2026
    Contingent Resources (2C) at 01/01/2026Production (2015-2024)CNPC Ai-Dan Munai production profileCapital Costs Pre-2016 to 2024 (US$ million)Operating Costs 2024 to 2033 (US$ million)Cash Flow (US$)PV Table (US$)Summary Table (US$)Split of Revenues
  • 7 more item(s)...

What's included

This report contains:

  • Document

    CNPC Ai-Dan Munai

    PDF 2.59 MB

  • Document

    CNPC Ai-Dan Munai

    PDF 2.59 MB