ETAP (BP)
*Please note that this report only includes an Excel data file if this is indicated in "What's included" below
Report summary
Table of contents
- Summary
-
Key Issues
- Murlach and Seagull tie-backs underpin production outlook
- Three well drilling campaign planned for 2028
- Future exploration
- Exploration history
- Machar
- Madoes
- Marnock
- Mirren
- 4 more item(s)...
- Capital costs
- Decommissioning costs
-
Operating costs
- Marnock CPF opex cost share
- Cash Flow
-
Cash Flow
- Machar
- Madoes
- Marnock
- Mirren
- Monan
- Mungo
- Murlach
Tables and charts
This report includes the following images and tables:
-
Capital Costs 2016 to 2025 (US$ million)Capital Costs 2036 to 2042 (US$ million)Index map
-
ETAP BP mapField participationField characteristicsDiscovery wellsDiscovery summaryReserves (2P) at 01/01/2026Production (2016-2025)ETAP (BP) production profilePlatform summary
- 23 more item(s)...
What's included
This report contains:
Other reports you may be interested in
Seagull
The Seagull high pressure/high temperature (HP/HT) field lies in the Central North Sea, 17 kilometres south of the ETAP (BP) Central ...
$3,720Barsa Gelmes-Kotur Tepe (Turkmenneft)
State-owned Turkmenneft operates the Barsa Gelmes-Kotur Tepe fields, which are Turkmenistan's largest onshore oil project. The ...
$3,720D6 Area
The D6 block consists of the Dhirubhai 1&3 gas field and a number of satellite fields in the Krishna-Godavari Basin, off the east …
$3,720