MLNG upstream fields
*Please note that this report only includes an Excel data file if this is indicated in "What's included" below
Report summary
Table of contents
- Summary
- Key Issues
- Emissions
-
Initial Development
- E11
- E11 Hub Project
- F23 and F6
- E8
- F13
-
Ongoing Development
- F6 Very Low Abandonment Pressure (F6 VLAP)
- F22, F27 and Selasih (FaS)
- Additional Development
-
Operating Costs
- LNG price
- Malaysia Reference Price (MRP)
- Other supply
- PETROS as gas aggregator
- Other Assumptions
- Cash Flow
- Condensate Price
- Gas Price
- 2 more item(s)...
Tables and charts
This report includes the following images and tables:
-
Index MapMLNG MapParticipation
-
Reserves (2P) at 01/01/2026Production (2016-2025)Production ProfileCapital Costs Pre-2017 to 2025 (US$ million)Operating Costs 2025 to 2034 (US$ million)MLNG Satu Gas PricesMLNG Tiga Gas PricesUpstream Malaysia Reference Price (MRP)
- 8 more item(s)...
What's included
This report contains:
Other reports you may be interested in
MLNG Dua upstream fields
Production began in December 1995 when the M3 field was brought onstream. Since then, the M1, M4, B11, B12, Shallow Clastics and …
$3,720MLNG Tiga - Commercial Overview
The third MLNG project (MLNG Tiga) started operations in 1995 at the MLNG complex in Bintulu, in the Malaysian state of Sarawak. Other ...
$2,700MLNG Dua - Commercial Overview
The first MLNG project (MLNG Satu) commenced operations in January 1983 at the MLNG complex in Bintulu, Sarawak, Malaysia. Other ...
$2,700