Asset Report

Nyhamna

Get this report*

$2,580

You can pay by card or invoice

For details on how your data is used and stored, see our Privacy Notice.
 

- FAQs about online orders

*Please note that this report only includes an Excel data file if this is indicated in "What's included" below

The Nyhamna gas processing terminal is located on the Norwegian island of Gossa in Møre and Romsdal county, 130 kilometres from the Ormen Lange field. The terminal was constructed between 2003 and 2007 to process gas from Ormen Lange. The terminal has also received gas from the Polarled pipeline since 2018, which transports gas from the Aasta Hansteen, Irpa and Dvalin fields in the Norwegian Sea. Processing capacity at the terminal was originally 70 mmscm/d (2,470 mmcfd). An ...

Table of contents

  • Summary
    • Norwegian State increases stake in the Nyhamna JV
    • Ormen Lange Phase 3 (OLP3) to extend throughput at Nyhamna to the early 2040s
    • Dvalin North achieves first gas
    • Future upside potential
    • Performance issue
    • Capacity constraints imposed by unplanned incidents
    • Polarled could ease capacity constraints on the ÅTS
    • Blue Hydrogen Project cancelled
    • 4 more item(s)...
    • Operating Costs
  • Cash Flow
  • Fiscal terms
  • Global Economic Model (GEM) file
  • Cash Flow (US$ million)
  • Cash Flow (NKr million)

Tables and charts

This report includes the following images and tables:

    Pipeline Gas Throughput ProfilePipeline Gas Throughput ProfileCapital Costs Pre-2017 to 2025 (US$ million)
    Transport Cash Flow US$Transport PV Table US$Transport Summary Table US$Split of RevenuesCumulative Net Cash Flow - UndiscountedCumulative Net Cash Flow - Discounted at 10% from 01/01/2026Remaining Revenue Distribution (Discounted at 10% from 01/01/2026)Transport Cash Flow (Local Currency)Transport PV Table (Local Currency)
  • 3 more item(s)...

What's included

This report contains:

  • Document

    Nyhamna

    XLS 505.00 KB

  • Document

    Nyhamna

    PDF 2.56 MB