PetroMasila fields
*Please note that this report only includes an Excel data file if this is indicated in "What's included" below
Report summary
Table of contents
- Summary
-
Key Issues
- Block 10 (East Shabwa)
- Block 51 (East Al Hajr)
- Block 53 (East Saar)
- Reservoir quality
- Block 14 (Masila)
- Block 10 (East Shabwa)
- Block 51 (East Al Hajr)
- Block 53 (East Saar)
- Emissions
- Block 14 (Masila)
-
Block 10 (East Shabwa)
- Power facilities
- Block 51 (East Al Hajr)
-
Block 53 (East Saar)
- Ash Shihr terminal
- Capital costs
- Operating costs
- Royalty
- Cost oil
- Profit oil
- 7 more item(s)...
Tables and charts
This report includes the following images and tables:
-
Index mapPetroMasila operated fields mapCapital Costs Pre-2016 to 2024 (US$ million)
-
Operating Costs 2024 to 2033 (US$ million)Cash Flow (US$)PV Table (US$)Summary Table (US$)Split of RevenuesCumulative Net Cash Flow - UndiscountedCumulative Net Cash Flow - Discounted at 10% from 01/01/2026Remaining Present Value Price SensitivitiesCash Flow (US$)
- 30 more item(s)...
What's included
This report contains:
Other reports you may be interested in
Energean-operated Greece fields
Energean operates Greece's only producing upstream project, the offshore Prinos Area oil fields, and the now ceased South Kavala ...
$3,720Vermilion Energy onshore fields
Vermilion Energy operates a number of onshore Dutch fields. Where there are synergies in geography, participation, and tax position, we ...
$3,720MLNG upstream fields
The MLNG PSC covers eight gas fields offshore Sarawak and was awarded in April 1997, replacing the 1976 Sarawak Shell PSC.
$3,720