Asset Report

Santana

Get this report*

$3,720

You can pay by card or invoice

For details on how your data is used and stored, see our Privacy Notice.
 

- FAQs about online orders

*Please note that this report only includes an Excel data file if this is indicated in "What's included" below

The Santana block contains two currently producing fields:Mary and Toroyaco . The other two fields, Linda and Miraflor, ceased production in 2012 and 2020, respectively. Development of the Linda/Toroyaco fields started first as they are very close to each other. Production for the block started in these fields in 1992. This was followed by the Mary/Miraflor development, although this was hindered by the fields being located on the far side of the wide Caqueta river.In 1997, production ...

Table of contents

  • Summary
  • Key Issues
  • 2016 bid round
  • History
  • Toroyaco and Linda
  • Mary and Miraflor
    • 2015-2017 Ecopetrol concession
    • Gran Tierra resumes operations
    • Cash flow
  • Cash Flow

Tables and charts

This report includes the following images and tables:

    Index MapDetail MapCurrent participation
    Field Hydrocarbon CharacteristicsReserves (2P) at 01/01/2026Production (2015-2024)Production ProfileCapital Costs Pre-2016 to 2024 (US$ million)Operating Costs 2024 to 2033 (US$ million)Cash Flow (US$)PV Table (US$)
  • 5 more item(s)...

What's included

This report contains:

  • Document

    Santana

    XLS 615.00 KB

  • Document

    Santana

    PDF 3.70 MB