Asset Report

Subba

Get this report*

$3,720

You can pay by card or invoice

For details on how your data is used and stored, see our Privacy Notice.
 

- FAQs about online orders

*Please note that this report only includes an Excel data file if this is indicated in "What's included" below

Subba is located 90 kilometres west of Basra. The field produced briefly in the late 1980s but was shut-in during 1991 because of the Gulf War. Production restarted in December 2017 with a small-scale development, but in 2019 production was shut-in due to technical issues. The field restarted for a second time in 2023 at 12,000 b/d. We expect production to ramp up over the next few years to reach 60,000 b/d by 2029 in an effort to maximise the supply of associated gas to the Ratawi Gas ...

Table of contents

  • Key facts
    • Summary
    • Key issues
      • Issues common to the southern oil developments
      • Issues specific to Subba
  • Location maps
  • Participation
  • Geology
  • Well data
  • Exploration
  • Reserves and resources
    • Emissions
    • Key Development Metrics
  • Infrastructure
    • Operating costs
  • 3 more item(s)...

Tables and charts

This report includes the following images and tables:

    Key facts: Table 1Index MapDetail Map
    Participation: Table 1Geology: Table 1Well data: Table 1Reserves and resources: Table 1Production: Table 1Production: Table 2Production ProfileInfrastructure: Table 1Costs: Table 1
  • 11 more item(s)...

What's included

This report contains:

  • Document

    Subba

    PDF 6.80 MB

  • Document

    Subba

    XLS 716.50 KB