Browse our metals cost reports
Inform your decision-making using comprehensive analysis of global metals supply and demand, detailed regional market fundamentals and metal price drivers.
Purchase by credit card or invoice
Featured reports
Metals costs reports
Baise Mining aluminium smelter
Total design capacity of Baise Mining is 1.3 Mtpa, consisting of 300-ktpa Xinshan, 200-ktpa Suyuan, 300-ktpa Debao, 300-ktpa Tianlin and 200-ktpa L...
Baotou East Hope aluminium smelter
Line 3 raised site capacity to 880kt/a. Wood Mackenzie’s asset reports are built from the bottom up, incorporating a number of granular data metric...
Gongyi aluminium smelter
Gongyi comprises two separate plants, costed as a single entity. Both plants have their own dedicated casthouses. Wood Mackenzie’s asset reports ar...
Xinjiang Shenhuo aluminium smelter
The company has indicated that the eventual scale of the smelter-power plant project will take smelting capacity to 1.6Mt/a and power generation to...
Xinjiang Tianshan aluminium smelter
Wood Mackenzie’s asset reports are built from the bottom up, incorporating a number of granular data metrics to ultimately produce our industry sta...
Xinjiang Xinfa smelter
The Xinfa smelter was the first large scale aluminium smelter in Xinjiang. Wood Mackenzie’s asset reports are built from the bottom up, incorporati...
Viewing page 257 of 448