Tamano copper smelter
The smelter was originally built on a greenfield site in 1972. In 1975 the lime scrubbing plant was installed to reduce the pollution from fugitive...
Toyo copper refinery
The refinery is located near Saijo City, Ehiime Prefecture, and has good road and rail links and excellent sea links via the company's own berth fo...
Tuticorin (closed) copper refinery
The refinery is located at Tuticorin in Tamil Nadu and has a nameplate capacity of 127kt/a of copper cathode. It was built as part of a major expan...
Jinchuan Guangxi copper refinery
The 400kt/a refinery was commissioned in 2013. The first batch of copper cathode was produced in January 2014. Wood Mackenzie’s asset reports are b...
Kidd Creek (closed) copper smelter
The smelter was commissioned in 1981 with a nominal capacity of 59kt/a copper and at a cost of US$240M, including the refinery. The potential for h...
Las Ventanas (closed) copper smelter
The smelter is located at Las Ventanas, 45km north of Valparaiso, Central Chile, and was commissioned in 1966. The smelting technology is Teniente ...