Browse our metals cost reports
Inform your decision-making using comprehensive analysis of global metals supply and demand, detailed regional market fundamentals and metal price drivers.
Purchase by credit card or invoice
Featured reports
Metals costs reports
Nanshan aluminium smelter
The smelter was commissioned in 1999. Construction of the two NEUI-400 lines was completed in 2010. One was commissioned in 2010, the other in 2011...
Qinghai Qiaotou aluminium smelter
Qinghai Qiaotou comprises three separate plants costed as a single entity. We include the Changqing smelter in the Qinghai Qiaotou costing from 200...
Qinghai Yellow River aluminium smelter
With the addition of the Line 4, total smelter capacity would rise to 1.2Mt/a. Wood Mackenzie’s asset reports are built from the bottom up, incorpo...
Shanxi Huaze aluminium smelter
Shanxi Huaze was commissioned in 2005. The smelter consists of two lines configured in two halls. Power is self generated and surplus is sold to th...
Sichuan Aostar (Meishan) aluminium smelter
Commissioned in 2003, the smelter is located near Meishan City in Sichuan and was the third built in the province. The plant consists of two lines ...
Aba aluminium smelter
We start costing the Aba smelter from the start up of the 360kA prebake facility. Wood Mackenzie’s asset reports are built from the bottom up, inco...
Viewing page 299 of 449