Browse our metals cost reports
Inform your decision-making using comprehensive analysis of global metals supply and demand, detailed regional market fundamentals and metal price drivers.
Purchase by credit card or invoice
Featured reports
Metals costs reports
Longquan (Yichuan) aluminium smelter
Longquan comprises two separate plants, which we cost as a single entity. Wood Mackenzie’s asset reports are built from the bottom up, incorporatin...
Loulo gold mine
Loulo commenced operations in November 2005 and began as two open pit mines. Subsequently, two underground mines have been developed at the Gara an...
Lynemouth aluminium smelter
The Lynemouth smelter was permanently closed in 2012. Wood Mackenzie’s asset reports are built from the bottom up, incorporating a number of granul...
Macrolink Heyi Alloy closed nickel operation
Macrolink Heyi is located in Inner Mongolia. The project has two 33,000 KVA RKEF's for nickel pig iron (NPI) production. The annual capacity is 300...
Massena East aluminium smelter
The remaining two Søderberg potlines were closed in 2014. Wood Mackenzie’s asset reports are built from the bottom up, incorporating a number of gr...
McCoy/Cove (Closed) lead mine
This historic underground and open pit operation provided ore a heap leach operation. Pyrite concentrate was also produced and sold to Newmont. Woo...
Viewing page 393 of 449