Browse our metals cost reports
Inform your decision-making using comprehensive analysis of global metals supply and demand, detailed regional market fundamentals and metal price drivers.
Purchase by credit card or invoice
Featured reports
Metals costs reports
Tursunzade aluminium smelter
Tursunzade is Tajikistan's only aluminium smelter. With a nameplate capacity of 420 ktpa, is the largest smelter by capacity in central Asia. It is...
Uralsk (S) aluminium smelter
The Søderberg lines were closed in 2009. Uralsk is now an exclusively prebake technology operation. Wood Mackenzie’s asset reports are built from t...
Nova-Bollinger copper mine
A Definitive Feasibility Study (DFS) was completed on the Nova-Bollinger project in July 2014. The project's owners, Sirius Resources had planned t...
Flin Flon Operations (Callinan) (Closed) copper mine
The Triple 7 (see separate costing) deposit commenced operations in 2003. Wood Mackenzie’s asset reports are built from the bottom up, incorporatin...
Wolverine Restart copper mine project
Wolverine was an underground mine owned and operated by Yukon Zinc. The mine closed in January 2015 due to low commodity prices. The closure was pl...
Lucky Break nickel project
The Lucky Break nickel project, located 140 km west of Townsville is a joint venture between Metals Finance Limited and Metallica Minerals Limited....
Viewing page 436 of 448